How a job moves, start to finish
Every piece of work is a Job, from the first call to the last payment. Each one has an owner, a next step, and a date. The AIOS flags a job that sits in a stage past the limit below, or passes its date.
| Stage | What happens | Usually | Flag after |
|---|---|---|---|
| New lead | A call, a form, a scheduler booking, a Roofle quote, or a Facebook message | Call Center | 1 day |
| Estimate scheduled | The visit is on an estimator's calendar | Scheduler, then the estimator | 10 days |
| Estimate sent | The written estimate is with the homeowner (or the adjuster, on a storm job) | Sales Estimator | 7 days |
| Signed, deposit in | Contract signed and the deposit received | Sales Estimator, then Production Administrator | 7 days |
| Material ordered | Material ordered, permit applied for | Production Administrator | 21 days |
| On the schedule | Material in, permit issued, the job on a crew's calendar | Scheduler | 21 days |
| In progress | The crew is building | Project Manager | 14 days |
| Punch list | The final walk found small things; final inspection if there is one | Project Manager | 5 days |
| Invoiced or paid | Final invoice sent, then paid | Production Administrator |
The two waits that cost the most
- New lead to the estimate visit. The website promises a visit "usually within 7-10 days of initial contact." Homeowners collecting quotes often sign with whoever comes first (see the lost leads on the Leads board). The fix is in From lead to estimate.
- The visit to the estimate in the homeowner's hands. Every day after the visit, the homeowner cools off. The goal is the same night (see Estimates).
Leads are separate
Someone who hasn't signed yet is also a lead on the Leads board (New lead, Called back, Estimate booked, Estimate out, then Signed or Lost), so the sales numbers and the reasons for losing are counted. When the estimate is booked, the lead also gets a Job.